Everything went off without a hitch over the weekend--appliances, painting, mantle.
We did get an idea of what the slide will look like. Lead time is 2-3 weeks, and they are in Canada, so I imagine in the next 4-5 weeks we should have it onsite. We also had to pick out three colors for preferences
Aside from that, Tile Guy #2 is hard at work. He did the dry-fitting for the master bathroom floor. Rusty also verified all the details from Best Tile for the master shower as well as the backsplash.