Windows are in, HVAC and wiring is progressing

The title pretty much says it all. From the way it looks, all the windows are in. Still some external-facing doors to be done, but it's ones like the door leading to the deck, which isn't built yet.

One of the HVAC guys was there. I chatted with him for a few, but left him to his work. It seemed he was working on the master bedroom fan. It looks like all the air returns are in place, though I see no duct work yet.

A lot of the wiring has been pulled throughout the first floor. I'm sure there is still a ton, but at least it is moving along. Some of the canned lights are in place in the living room and kitchen as well.

Dawn had ordered some medicine cabinets for the boys' bathrooms. This was not something in the plans, so Rusty had to frame for them. That has been done, too. Nothing big, bit I see they had to cut some water pipes, so I guess they have to work around the framing now.

The cabinet guys were out on, I think, Friday. They have some preliminary plans they are working on, a few different layouts. We are potentially meeting with them sometime early next week.